Abstract:
This report contains the results for the benthic macroinfaunal monitoring of the Intracoastal Waterway (ICW) in Venice of November 2, 2005, the 30th quarterly sampling since the RO plant began discharging. Results from previous samplings are contained in earlier technical reports.
Description:
21 p. (25 p. pdf), map, illus., tables.